Sungun Copper Project

Sungun Copper Project | Engineering Design and Commissioning

METS was commissioned to expand a concentrator to treat 9Mtpa of copper ore (having a grade of 0.75%) to produce copper concentrate. The role included the basic design, generation of flowsheets, equipment lists, mass balances and process design criteria to permit the design and commissioning phases.

METS were initially approached by National Iranian Copper Industries Co, which then elicited meetings with Iran to confirm the project scope. General engineering principles were then followed through to design finalisation.